Close Menu
Tech Savvyed
  • Home
  • News
  • Artificial Intelligence
  • Gadgets
  • Apps
  • Mobile
  • Gaming
  • Accessories
  • More
    • Web Stories
    • Spotlight
    • Press Release

Subscribe to Updates

Get the latest tech news and updates directly to your inbox.

What's On
Motorola’s new Razr Ultra foldable is prettier than ever, and pricier, too

Motorola’s new Razr Ultra foldable is prettier than ever, and pricier, too

30 April 2026
Every call you make is drawing a map of your city — here’s who watching

Every call you make is drawing a map of your city — here’s who watching

30 April 2026
Tesla promises HW3 owners a lite version of FSD, but its months away

Tesla promises HW3 owners a lite version of FSD, but its months away

30 April 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Tech Savvyed
SUBSCRIBE
  • Home
  • News
  • Artificial Intelligence
  • Gadgets
  • Apps
  • Mobile
  • Gaming
  • Accessories
  • More
    • Web Stories
    • Spotlight
    • Press Release
Tech Savvyed
Home»News»NASA confirms target date for crewed Artemis II lunar flight
News

NASA confirms target date for crewed Artemis II lunar flight

News RoomBy News Room17 February 20262 Mins Read
NASA confirms target date for crewed Artemis II lunar flight
Share
Facebook Twitter Reddit Telegram Pinterest Email

NASA has announced a date for the second wet dress rehearsal for the SLS rocket that will send a crew of astronauts on a voyage around the moon in the highly anticipated Artemis II mission.

The space agency also confirmed that the earliest the rocket could launch is Friday, March 6.

NASA is now targeting Thursday, February 19, for the fueling part of the wet dress rehearsal at the Kennedy Space Center launch site in Florida.

The rehearsal is a key part of flight preparation and involves engineers fueling the rocket and going through the entire launch procedure short of actually igniting the engines.

During the first Artemis II rehearsal at the start of this month, engineers spotted a hydrogen leak at the base of the SLS rocket, prompting the team to ditch the target launch date of February 8 while it addressed the issue.

NASA said that it will only announce a new target launch date once the results of the second wet dress rehearsal have been fully assessed, but said the rocket would not lift off before March 6.

“The wet dress rehearsal will run the launch team as well as supporting teams through a full range of operations, including loading cryogenic liquid propellant into the SLS rocket’s tanks, conducting a launch countdown, demonstrating the ability to recycle the countdown clock, and draining the tanks to practice scrub procedures,” NASA said in a post on its website on Monday.

It added that the launch controllers will arrive at their consoles in the Launch Control Center at Kennedy at 6:40 p.m. ET on Tuesday to start the nearly 50-hour countdown. The simulated launch time is 8:30 p.m. on Thursday.

The Artemis II mission will send NASA astronauts Victor Glover, Reid Wiseman, and Christina Koch, together with the Canadian Space Agency’s Jeremy Hansen, on a 10-day flight around the moon aboard the Orion spacecraft. It’ll be the first crewed lunar-bound flight since the final Apollo mission in 1972.

The mission will test the spacecraft’s systems and deep-space operations to validate them for future crewed moon missions and lunar landings.

Share. Facebook Twitter Pinterest LinkedIn Telegram Reddit Email
Previous ArticleNioh 3 Review – Taking The Throne
Next Article Silent chip defects may be corrupting data in modern computers

Related Articles

Motorola’s new Razr Ultra foldable is prettier than ever, and pricier, too

Motorola’s new Razr Ultra foldable is prettier than ever, and pricier, too

30 April 2026
Every call you make is drawing a map of your city — here’s who watching

Every call you make is drawing a map of your city — here’s who watching

30 April 2026
Tesla promises HW3 owners a lite version of FSD, but its months away

Tesla promises HW3 owners a lite version of FSD, but its months away

30 April 2026
Gemini can now turn your chat into a finished PDF, Word document, or spreadsheet in one tap

Gemini can now turn your chat into a finished PDF, Word document, or spreadsheet in one tap

29 April 2026
Your Google TV experience is about to get chaotic with a dedicated YouTube Shorts feed

Your Google TV experience is about to get chaotic with a dedicated YouTube Shorts feed

29 April 2026
Apple may integrate visual AI directly into camera app with iOS 27

Apple may integrate visual AI directly into camera app with iOS 27

29 April 2026
Demo
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Don't Miss
Every call you make is drawing a map of your city — here’s who watching

Every call you make is drawing a map of your city — here’s who watching

By News Room30 April 2026

You don’t actually need to share your location for your city to figure out where…

Tesla promises HW3 owners a lite version of FSD, but its months away

Tesla promises HW3 owners a lite version of FSD, but its months away

30 April 2026
Gemini can now turn your chat into a finished PDF, Word document, or spreadsheet in one tap

Gemini can now turn your chat into a finished PDF, Word document, or spreadsheet in one tap

29 April 2026
Your Google TV experience is about to get chaotic with a dedicated YouTube Shorts feed

Your Google TV experience is about to get chaotic with a dedicated YouTube Shorts feed

29 April 2026
Tech Savvyed
Facebook X (Twitter) Instagram Pinterest
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact
© 2026 Tech Savvyed. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.