Close Menu
Tech Savvyed
  • Home
  • News
  • Artificial Intelligence
  • Gadgets
  • Apps
  • Mobile
  • Gaming
  • Accessories
  • More
    • Web Stories
    • Spotlight
    • Press Release

Subscribe to Updates

Get the latest tech news and updates directly to your inbox.

What's On
Meta and Google just got beaten by an AI giant you might not expect

Meta and Google just got beaten by an AI giant you might not expect

17 August 2026
I found a better way to dictate on my Mac, and it doesn’t need the cloud

I found a better way to dictate on my Mac, and it doesn’t need the cloud

17 August 2026
Mac users now have an easier way to install apps from DMG files

Mac users now have an easier way to install apps from DMG files

17 August 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Tech Savvyed
SUBSCRIBE
  • Home
  • News
  • Artificial Intelligence
  • Gadgets
  • Apps
  • Mobile
  • Gaming
  • Accessories
  • More
    • Web Stories
    • Spotlight
    • Press Release
Tech Savvyed
Home»News»NASA is investing $590 million in private contractors to build humanity’s first Moon outpost
News

NASA is investing $590 million in private contractors to build humanity’s first Moon outpost

News RoomBy News Room1 July 20262 Mins Read
NASA is investing 0 million in private contractors to build humanity’s first Moon outpost
Share
Facebook Twitter Reddit Telegram Pinterest Email

Building a permanent base on the Moon sounds like science fiction, but NASA is making it feel a lot more real. The agency just handed $590 million in contracts to three private companies for four uncrewed lunar lander missions launching in late 2028.

These missions are part of Phase 1 of NASA’s broader $30 billion Moon Base program, which needs to deliver landers, rovers, and scientific cargo up there before astronauts eventually move in. These efforts are closely tied NASA’s Artemis program, which sent humans on a lunar flyby in April for the first time since the Apollo era.

Who is building NASA’s Moon outpost?

According to NBC News, Astrobotic received the biggest slice, $297.9 million, for two missions. Firefly Aerospace secured $144.2 million for one lander, while Intuitive Machines won $148.3 million for another. NASA says these repeated robotic trips are crucial because future human crews will depend on those systems working flawlessly.

However, the track record so far is a mixed bag. Firefly is the only private company to nail a clean Moon landing, with its Blue Ghost vehicle touching down upright in March 2025. Astrobotic’s Peregrine mission never made it past Earth orbit, while Intuitive Machines reached the surface twice but tipped over on both attempts.

NASA is also exploring whether a Mars rover prototype called Promise could be repurposed for lunar missions, adding more science capabilities to the outpost effort.

Why is NASA accelerating the timeline?

This first phase will cost around $10 billion and run through 2028, but the urgency goes beyond engineering. China is rapidly expanding its lunar program, and both countries are targeting the Moon’s south pole because it may contain water ice that could be turned into drinking water or rocket fuel.

The lunar surface.

NASA is also dealing with setbacks. Blue Origin’s New Glenn rocket exploded on the launchpad in May, delaying its planned Blue Moon lander mission. NASA has already started exploring backup launch options to avoid losing time.

If all goes to plan, this Moon Base will grow into a settlement where astronauts live and work. It is expensive, risky, and years away, but NASA just made one of its most decisive moves yet toward getting there.

Share. Facebook Twitter Pinterest LinkedIn Telegram Reddit Email
Previous ArticleThe PlayStation Stores On PlayStation 3 And Vita Are Being Shut Down
Next Article Mario Kart World Update Adds New Knockout Tour Routes And Stickers For Photo Mode

Related Articles

Meta and Google just got beaten by an AI giant you might not expect

Meta and Google just got beaten by an AI giant you might not expect

17 August 2026
I found a better way to dictate on my Mac, and it doesn’t need the cloud

I found a better way to dictate on my Mac, and it doesn’t need the cloud

17 August 2026
Mac users now have an easier way to install apps from DMG files

Mac users now have an easier way to install apps from DMG files

17 August 2026
Are classroom screens making children less cognitively capable? Experts are divided

Are classroom screens making children less cognitively capable? Experts are divided

17 August 2026
I tried a smart bracelet as my digital journal and mood calendar. It’s odd, but it works.

I tried a smart bracelet as my digital journal and mood calendar. It’s odd, but it works.

17 August 2026
Intel may be cooking up a budget Panther Lake chip for gaming handhelds

Intel may be cooking up a budget Panther Lake chip for gaming handhelds

16 August 2026
Demo
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Don't Miss
I found a better way to dictate on my Mac, and it doesn’t need the cloud

I found a better way to dictate on my Mac, and it doesn’t need the cloud

By News Room17 August 2026

Apple has improved its dictation feature a lot on the Mac, but it’s still nowhere…

Mac users now have an easier way to install apps from DMG files

Mac users now have an easier way to install apps from DMG files

17 August 2026
Are classroom screens making children less cognitively capable? Experts are divided

Are classroom screens making children less cognitively capable? Experts are divided

17 August 2026
I tried a smart bracelet as my digital journal and mood calendar. It’s odd, but it works.

I tried a smart bracelet as my digital journal and mood calendar. It’s odd, but it works.

17 August 2026
Tech Savvyed
Facebook X (Twitter) Instagram Pinterest
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact
© 2026 Tech Savvyed. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.